Okowa To Commission Ellu, Ovrode, Ofagbe, Orie, Okpe-Isoko, Uro to Ada-Irri Road in Isoko North and Isoko South LGA in December 2022.






Delta State Governor, Dr. Ifeanyi Okowa, has stated that the 24-kilometer Isoko Ring Road project running from Ellu, Ovrode, Ofagbe, Orie, Okpe-Isoko, Uro to Ada-Irri in Isoko North and Isoko South LGA will be completed in December 2022.

Governor Okowa disclosed this to newsmen shortly after inspecting construction of the bridge linking Ellu and Ofagbe on the road.

The Governor explained that the project was divided into three sections for ease of execution, adding that the bridge being constructed was to address the perennial problem of flooding on the existing bridge on the road which was usually flooded whenever it rained heavily.

Popular posts from this blog

Okowa deplores poor services by BEDC

BREAKING NEWS : Ovrode Community Shuts Down Ughelli/Asaba Express Way

BREAKING NEWS: HOUSE OF REPS CONCURS WITH SENATE ON OMO-AGEGE ANTI-SEXUAL HARASSMENT BILL